PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed sheathing at Room 151 Facing South.jpg Laying out block at 1st floor Locker Rooms Facing North.jpg Poured concrete at the Boiler-Electrical Room Facing West.jpg Closing up the parapet at the West Elevation.jpg Installing insulation around the perimeter of the UCIA Roof Facing West.jpg Patching up the high roof terminations Facing East.jpg Prepping for the pressure testing at the 3rd floor Facing West.jpg
Previous pageNext page Installing insulation around the perimeter of the UCIA Roof Facing West
Installing insulation around the perimeter of the UCIA Roof Facing West